Click here to make tpub.com your Home Page

Page Title: BATTERY TO SHUNT CABLE ASSEMBLY REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-76. BATTERY TO SHUNT CABLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Spare tire lowered (TM 9-2320-366-10-2).
Lockwasher (Item 87, Appendix G)
Cab raised (TM 9-2320-366-10-1).
Batteries disconnected (para 7-57).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
a. Removal.
(1) Loosen clamp (1) on turbocharger intake hose (2).
(2) Remove turbocharger intake hose (2) from intake air
cleaner boot (3).
(3) Remove screw (4), lockwasher (5), and terminal lug
TL52 (6) from shunt (7). Discard lockwasher.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business