|
|
TM 9-2320-366-20-3
7-76. BATTERY TO SHUNT CABLE ASSEMBLY REPLACEMENT (CONT)
b. Installation.
(1) Install terminal lug TL52 (1) on shunt (2) with
lockwasher (3) and screw (4).
(2) Position turbocharger intake hose (5) on intake air
cleaner boot (6) with clamp (7).
(3) Tighten clamp (7) to 36-48 lb-in. (4-5 Nm).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Raise spare tire (TM 9-2320-366-10-2).
(3) Start engine (TM 9-2320-366-10-1).
(4) Shut down engine (TM 9-2320-366-10-1).
End of Task.
7-350
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |