|
|
TM 9-2320-366-20-3
This task covers:
a. Water Pump Removal
c. Fittings Removal
b. Water Pump Installation
d. Fittings Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts
100 amp alternator removed, if equipped (para 7-2).
Antifreeze, Ethylene Glycol, Permanent (Item 12,
200 amp alternator removed, if equipped (para 20-45).
Alternator brackets removed (para 7-4).
Packing, Preformed (Item 195, Appendix G)
Packing, Preformed (Item 214, Appendix G)
Tools and Special Tools
Packing, Preformed (3) (Item 205, Appendix G)
Goggles, Industrial (Item 15, Appendix C)
Packing, Preformed (2) (Item 202, Appendix G)
Container (52 qt (50 L) capacity)
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
Wrench, Adjustable, Automotive (Item 53, Appendix C)
Gage, Belt Tension (Item 19, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel
a. Water Pump Removal.
(1) Position container under radiator (1).
(2) Remove radiator cap (2) from radiator overflow tank
(3).
(3) Open radiator draincock (4) and drain coolant.
(4) Close radiator draincock (4).
Change 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |