|
|
TM 9-2320-366-20-3
This task covers:
a. Support Brackets Removal
c. Belt Take-Up Bracket Removal
b. Support Brackets Installation
d. Belt Take-Up Bracket Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Material/Parts
100 amp alternator removed, if equipped (para 7-2).
Sealing Compound (Item 57, Appendix D)
200 amp alternator removed, if equipped (para 20-45).
Nut, Self-Locking (Item 167, Appendix G)
Tools and Special Tools
Personnel Required
Goggles, Industrial (Item 15, Appendix C)
(2)
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Gage, Belt Tension (Item 19, Appendix B)
a. Support Brackets Removal.
NOTE
Note location of different size screws for
installation.
(1) Remove two screws (1), washers (2), and belt adjusting
arm (3) from alternator bracket (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |