|
|
TM 9-2320-366-20-3
c. Follow-On Maintenance.
(1) Install fuel ratio control tube (para 4-6).
(2) Install fuel pressure regulating valve (para 4-3).
(3) Lower cab (TM 9-2320-366-10-1).
(4) Start engine (TM 9-2320-366-10-1).
(5) Raise cab (TM 9-2320-366-10-1).
(6) Check for fuel leaks around fuel ratio control tube and
orifice tube assembly.
(7) Check that engine runs smoothly at low idle speed.
(8) Check that engine runs smoothly at high idle speed.
(9) Lower cab (TM 9-2320-366-10-1).
(10) Shut down engine (TM 9-2320-366-10-1).
End of Task.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |