|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Engine shut down (TM 9-2320-366-10-1).
Tool Kit, Genl Mech (Item 46, Appendix C)
Cab raised (TM 9-2320-366-10-1).
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Fuel pressure regulating valve removed
Materials/Parts
Fuel ratio control tube removed (para 4-6).
Packing, Preformed (Item 209, Appendix G)
WARNING
Diesel fuel is flammable. If fuel is spilled,
clean it up immediately. Failure to comply
may result in serious injury or death to
personnel.
a. Removal.
(1) Remove two screws (1) and washers (2) from orifice
tube assembly (3).
(2) Remove screw (4), orifice tube assembly (3), and
preformed packing (5) from cylinder head (6). Discard
preformed packing.
b. Installation.
(1) Position preformed packing (5) on cylinder head (6).
(2) Position orifice tube assembly (3) on cylinder head (6)
with screw (4).
(3) Position two washers (2) and screws (1) in orifice tube
assembly (3).
(4) Tighten screw (4) to 15-25 lb-ft (20-34 Nm).
(5) Tighten two screws (1) to 33-47 lb-ft (45-64 Nm).
4-40
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |