Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
(5) Position clamp (7) on valve cover (2) with washer (8)
and screw (9).
(6) Tighten 13 screws (6) and screw (9) to 84-132 lb-in. (9-
15 Nm) in sequence shown.
c. Follow-On Maintenance.
(1) Install charge air cooler to air inlet elbow tubes/hoses
(2) Lower cab (TM 9-2320-366-10-1).
(3) Start engine (TM 9-2320-366-10-1).
(4) Raise cab (TM 9-2320-366-10-1).
(5) Check for oil leaks around valve cover gasket.
(6) Lower cab (TM 9-2320-366-10-1).
(7) Shut down engine (TM 9-2320-366-10-1).
End of Task.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business