|
|
TM 9-2320-366-20-3
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Engine shut down (TM 9-2320-366-10-1).
Tool Kit, Genl Mech (Item 46, Appendix C)
Air tanks drained (TM 9-2320-366-10-1).
STE/ICE-R (Item 41, Appendix C)
M1089 control panel covers removed (para 17-20)
M1089 30K Winch Pneumatic Test Adapter
(RH side).
(Item 25, Appendix E)
Goggles, Industrial (Item 15, Appendix C)
Personnel Required
Nut, Self-Locking (2) (Item 133, Appendix G)
(2)
Sealing Compound (Item 58, Appendix D)
References
TM 9-4910-571-12&P
NOTE
M1089 LH and RH 30K winch cable drum
tensioners are tested the same way. LH
side shown.
WARNING
Read WARNING
KNOWN INFO
TEST OPTIONS
on following page.
1.
Main winch LH/RH freespools.
Air Pressure Test
STE/ICE-R Test #50
Is 55-65 PSI (380-448 kPa)
POSSIBLE PROBLEMS
present at output 90 degree
REASON FOR QUESTION
Faulty M1089 LH/RH 30K
fitting of shuttle valve?
This question eliminates
winch cable tensioner.
possible problems and
Faulty 30K winch pneumatic
determines where
manifold solenoid L8/L4.
troubleshooting continues.
Faulty M1089 LH/RH 30K
winch pneumatic valve
assembly.
NO
Faulty air hose.
YES
Go to step 3 of this fault.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |