TM 9-1330-200-34/TM 1330-34/1
A. STANDING OPERATING PROCEDURE FOR:
C&P Grenade Hand Frag Delay M61
B. OPERATION NO. 3
C. Bay No.
D. SOP NO. AMXZZ-100
DATE 5 May 92
E. Rev No. 1
DATE 10 Aug 92
F Change No. 1
DATE 21 Aug 92
G. OPERATION: PAINT GRENADE
H. EXPLOSIVE LIMITS: UNITS: 60 EXPLOSIVE LBS: 21
I. PERSONNEL LIMITS: OPERATORS: 1 TRANSIENTS: 1
J.
Step No.
Description
1.
Receive grenades from operation No. 2.
2.
Fill paint container.
3.
Dip grenade in paint.
4.
Hang on rack until dry.
Specific Instruction (Safety, Operational, Quality Characteristics.)
1. (QC) Good workmanship-Visual* (DS-3) must be maintained.
2. (QC) Paint coverage must be adequate.
*DS-3: The grenade will be free of dirt, chips, grease, rust and other foreign material.
K. SPECIAL REQUIREMENTS .................................
Surveillance will perform periodic test to insure that all grounding is adequate.
L. Equipment, tools, gages, and supplies.
Spec No.
Item
Qty reqd
or DWG NO.
NSN
Enamel
as req
MS 35527-8
Enamel
MS 35527-9
Enamel
TT-E-516
Dry rack
as req.
Fabricate
Suspension device
as req
Fabricate
Line H - Explosive Limits. Specify maximum number of
units and pounds of explosive within limitations
(2) Instruction for preparation.
Prepare
established for area, consistent with safe and efficient
SOP's as follows:
operation.
Line A - Standing Operating Procedure For. Indicate
operation and nomenclature of item being worked (e.g.,
Line I - Personnel Limits. Specify maximum number of
"Care and Preservation Grenade, Hand: Fragmentation,
operators and transients allowed at operation.
Delay M61).
(Transients may include on-post and off-post visitors,
and trainees undergoing cross training.)
Line C - Bay NO. Show bay, room, or cubicle number.
Line J - Step NO. Description-of Operation, and
Line G - Operation.
Identify operation
(e.g., paint
Specific Instructions. List procedural details of work to
grenade).
be performed under "Description" of operation in
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |