|
|
TM 9-1330-200-34/TM 1330-34/1
Chart 3-1. Sample Process Flow Chart
Operation
Time
required
No.
Description
Primary
Secondary
Personnel
Tools and
Materials
(min)
required
equipment
1
Open boxes, remove fiber
2
containers
X
2
Shears
Pliers
5
2
Inspect boxes and containers
X
1
3
Strip tape from container,
1
remove fuze, inspect
X
1
(1)
Each operation is listed as a main or secondary
operation.
detailed explanation of each operation, as follows:
(3) A main line operation is essential to a
(a) It expands on the information given
smooth flow of production.
on the flow sheet by explaining the mechanics of
operation in detail.
(4) Secondary operations may be shunted
from the main line into branch lines to be returned at a
(b) It lists additional information, such
point further along the main line.
as special hazards, and special operating methods.
(c) It groups together the operations
which will be performed in one unit of the line, operating
c. Standing Operating Procedure (SOP).
A
room or one bay.
standing operating procedure must be prepared after the
process flow chart is completed.
3-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |