TM 9-1330-200-34/TM 1330-34/1
numbered and logical sequence. Describe sufficiently to
(2) It preserves and maintains surveillance
allow operator to accomplish task in safe and technically
records.
correct manner. Specific instructions are intended to
(3) It provides means of withdrawing
furnish information that applies to one specific step of
defective, deteriorated, hazardous, or obsolete
the operation not included in the actual description of
ammunition, and explosive material from service.
physical work performed. (Items to be listed here
b. Description and Use. For all ammunitions, the
include quality characteristics, specific safety equipment
lot number will normally consist of a manufacturer's
or clothing required, safety precautions to be taken, and
identification symbol, and interfix number, and the serial
technical
instructions
pertaining
to
task
number as illustrated:
accomplishment.) Have all specific instructions indicate
step and type of instruction: Safety (S), Operational
ABC-8-124
(O) and Quality Control (QC).
Locate specific
instructions opposite step in operation description to
which applicable.
(1) Manufacturer's Identification
Symbol.
The manufacturer's identification symbol will consist of
Line K - Special Requirements. Include instructions
one, two, or three letters. They are assigned to identify
which apply to one operation only and, normally, not to
the arsenal, plant, depot or station, in case of loaded
any other operation or particular step of operation.
items, or indicate the contractor in case of components.
(Instructions may apply to safety, technical aspects of
(2) The Interfix Number. Each lot number,
the operation, defect standards, or equipment inspection
including that of the first lot, will have an interfix number
requirements. Items covered under item J of the SOP
between the manufacturer's identification symbol and
need not be duplicated under item K.)
the serial number. The interfix number indicates the lots
made according to a specific design or manufacturing
procedure.
(3) The Serial Number. The serial number
Operations for a specific task should be planned for
will identify the lot according to the sequence of
completion on a day-to-day basis to eliminate the
production. Serial number will be changed with the
accumulation of hazardous material.
information of each new group.
c. Description and Use of Lot Numbers for
Maintenance Operations. For renovated, modified, or
regrouped operations, the lotting will be accomplished
The line provided for these operations must permit safe
as follows:
and efficient flow of materials. [Where feasible, it will
employ such items as roller conveyors, work tables,
(1) Maintenance.
Where new components
other tools, equipment (chap.
2) and expendable
replace like components (same model number), a lot
materials (see app. B)]. Personnel, work stations, type
suffix will be assigned by the Commander, US Army
of equipment and material to accomplish the operations
Armament Munitions and Chemical Command, ATTN:
will be based on current work directives and results of
AMSMC-QAD, Rock Island, IL 61299-6000.
preliminary inspection. Provisions shall be made, when
necessary, to include barricades as required by section
200 replaces fuzes. The suffix furnished for LOP 1-8
VIII, TM 9-1300-206. Figure 3-2 shows a typical line
changed the lot number to LOP 18A.
layout.
(2) Conversion/modification
Where
3-8. Lot Numbers
components
replace
different
components,
components are added or where work is extensive
a. General. Lot numbering of ammunition serves
enough to warrant model number change (e.g., from
to identify material.
Grenade,
Hand, Fragmentation M26 to M26A1) new
lots will be formed. Lot numbers will be assigned in the
(1) It assures
accurate
control
of
movements of items.
|