TM 5-5420-279-23
TSUM - 2-014 Boom Bridge Forward High Bank (56) Part 4
Part 4
A ll Maintainer
Tasks
Fit pressure
See m aintenance
Does
gauge to TPB1 on
procedure 5-132, item 3.
Y es
No
gauge read 3191 psi
W inch Control
Replace 3191 psi (22000
(22000 kPa)
M anifold
kPa) relief valve
O perate joystick to
Carriage Out
P m ore than 1305 psi
Does
P less than 73 psi
(9000 kPa)
G auge read
(500 kPa)
W ith joystick operated to
Replace Lower W inch
Carriage Out - m anually
assem bly. See
operate solenoid SV15a
m aintenance procedure
on Launching Fram e
6-016
W inch Control Manifold
Does
Replace
Replace back
gauge
solenoid coil SV15a.
tension pressure reducing
Y es
No
read less than
S ee m aintenance
valve. See m aintenance
73 psi (500
procedure 5-124
procedure 5-132, item 5
kP a)
|