|
|
TM 5-5420-279-23
TSUM - 2-014 Boom Bridge Forward High Bank (56) Part 3
All Maintainer
Tasks
Fit pressure gauge to
Operate chest
TPB7 on Launch
pack joystick to
Part 3
Fram e Pilot Manifold
Carriage Out
W ith joystick operated to
Fit pressure
Does
Carriage Out - m anually
Yes
No
gauge to TPA1 on
gauge read 363 psi
operate SV8 on
W inch Manifold
(2500 kPa)
Launch Fram e Pilot Manifold
Operate chest
Fit pressure
Does
pack joystick
gauge to TPP2 on
No
gauge read 363 psi
joystick to
Launch Fram e
(2500 kPa)
Carriage Out
Pilot Manifold
Yes
Replace
Does
Go to Part
solenoid coil on SV8.
gauge read 363 psi
4
See m aintenance
(2500 kPa)
procedure 5-124
Yes
No
Replace SV8
See m aintenance
valve assem bly
procedure 5-130, item 5.
See m aintenance
Replace 363 psi (2500 kPa)
procedure 5-122
reducing valve
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |