Click here to make tpub.com your Home Page

Page Title: TSUM - 2-015 Boom Bridge Forward Low Bank (56) Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 2-015 Boom Bridge Forward Low Bank (56) Part 1
Bridge will not boom
forward
Upper W inch not
Disconnect link
Is link
seized when beam
between hom e
disconnected
built, proportional
No
bank and far bank
between
valve proven to
work in other
functions
Yes
Confirm correct function
Ensure bridge in
of Upper W inch as
Low Bank m ode
follows:- Step to Top
on chest pack
W inch on chest pack.
Operate joystick to pay
out rope.
NOTE CAUTION
Operate joystick to take
Nothing drives
up slack rope
when joystick
operated in m ode
O perator
Tasks
Maintainer
G o to Upper
Does
Tasks
W inch Check.
Upper W inch
No
See hydraulic trouble
operate under
shooting chapter 2
proportional
procedure 2-029
control
Yes
CAUTIO N
Confirm correct function
W hen checking function of
of Lower W inch as
winches by paying out rope allow
follows:-
O NLY SUFFICIENT SLACK to
Step to Bridge Lift on
dem onstrate correct functioning.
chest pack. Operate
DO NOT ALLOW SLACK rope to
joystick to pay out rope.
becom e caught on other parts of
NOTE CAUTION
the equipm ent or becom e
Operate joystick to Bridge
incorrectly positioned on sheave
Raise to take up slack
blocks etc.
rope.
Go
to
Part 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business