TM 5-5420-279-23
TSUM - 2-014 Boom Bridge Forward High Bank (56) Part 2
Maintainer
O perator
Tasks
Tasks
Part 2
Does
O perate joystick to
Go to Lower W inch Check.
Lower W inch
pay out a sm all
Yes
No
See hydraulic trouble shooting
operate under
am ount of slack
chapter 2 procedure 2-028
proportional
rope.
control
NO TE CAUTION
Step to Level
Bank m ode.
O perate joystick to
Carriage Out
Check for m echanical
Does
No
jam m ing of of carriage, bridge
bridge m ove
section or roller brakes.
forward
See -10 chapter 9
Yes
Does
CAUTIO N
No
bridge stop when
W hen checking function of
Fault cleared
slack in rope is
winches by paying out
taken up
rope allow ONLY
SUFFICIENT SLACK to
dem onstrate correct
Yes
functioning.
DO NOT ALLOW SLACK
rope to becom e caught on
other parts of the
Ensure MIMIC panel
equipm ent or becom e
indication and LED
incorrectly positioned on
illum ination agree with
sheave blocks etc.
energisation chart at
Do
See electrical
MIMIC
G o to Part
trouble shooting
No
panel indications
Yes
procedure chapter 3
3
and lit LEDs
3-010
agree
|