TM 5-5420-279-23
TSUM - 2-013 Boom Bridge Forward Level Bank (56) Part 2
Maintainer
Operator
Tasks
Tasks
Part 2
Does
G o to Upper W inch
O perate joystick to pay out a
Lower W inch
No
Check. See hydraulic
Yes
sm all am ount of slack rope.
operate under
trouble shooting chapter 2
NOTE CAUTION
proportional
procedure 2-029
control
Step to Level Bank m ode.
Operate joystick to Carriage Out
Check for m echanical
No
Does bridge
jam m ing of of carriage, bridge
m ove forward
section or roller brakes.
See -10 Chapter 9
Yes
Does
CAUTION
No
bridge stop when
W hen checking function of
Fault cleared
slack in rope is
winches by paying out rope
taken up
allow ONLY SUFFICIENT
SLACK to dem onstrate
correct functioning.
Yes
DO NOT ALLOW SLACK
rope to becom e caught on
Ensure MIMIC panel
other parts of the equipm ent
indication and LED
or becom e incorrectly
illum ination agree with
positioned on sheave blocks
energisation chart at
etc.
Do
See electrical
MIMIC
trouble shooting
Yes
G o to Part 3
No
panel indications and lit
chapter 3 procedure
LEDs agree.
3-009
|