Click here to make tpub.com your Home Page

Page Title: TSUM - 2-013 Boom Bridge Forward Level Bank (56) Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 2-013 Boom Bridge Forward Level Bank (56) Part 1
Bridge will not boom
forward
Is link
Top W inch not seized
No
Disconnect link
disconnected
when beam built,
between hom e bank
between
proportional valve proven
and far bank carriages
to work in other functions
Yes
Confirm correct function of
Upper W inch as follows:- Step
to Top W inch on chest pack.
Ensure bridge in
O perate joystick to pay out
Level Bank m ode
rope. NOTE CAUTION
on chest pack
Operate joystick to take up
slack rope
Nothing drives
when joystick
operated.
Operator
Tasks
Maintainer
G o to Upper
Does
Tasks
W inch Check.
Top W inch
See hydraulic trouble
operate under
No
shooting chapter 2
proportional
procedure 2-029
control
Yes
CAUTIO N
Confirm correct function
W hen checking function of
of Lower W inch as
winches by paying out rope allow
follows:-
O NLY SUFFICIENT SLACK to
Step to Bridge Lift on
dem onstrate correct functioning.
chest pack. Operate
DO NOT ALLOW SLACK rope to
joystick to pay out rope.
becom e caught on other parts of
NOTE CAUTION
the equipm ent or becom e
Operate joystick to Bridge
incorrectly positioned on sheave
Raise to take up slack
blocks etc.
rope.
Go to Part 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business