|
|
TM 9-2320-366-20-3
c. Follow-On Maintenance.
(1) Deleted.
(2) Deleted.
(3) Install secondary and primary air tanks (para 11-22).
(4) Install wet tank (para 23-12).
(5) Install NATO power cable (para 7-70).
(6) Install batteries (para 7-55).
(7) Start engine (TM 9-2320-366-10-1).
(8) Check VOLTS gage for charge indication (TM 9-2320-
366-10-1).
(9) Shut down engine (TM 9-2320-366-10-1).
End of Task.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |