|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools (Cont)
Batteries removed (para 7-55).
Wrench, Torque, 0-600 lb-ft (Item 60, Appendix
NATO power cable removed (para 7-70).
Wet tank removed (para 23-12).
Adapter, Socket Wrench (Item 1, Appendix C)
Secondary and primary air tanks removed (para 11-
Socket Set, Socket Wrench (Item 35, Appendix
22).
Tools and Special Tools
Materials/Parts
Tool Kit, Genl Mech (Item 46, Appendix C)
Lockwasher (2) (Item 90, Appendix G)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Nut, Self-Locking (4) (Item 161, Appendix G)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Washer, Flat (10) (Item 279.1, Appendix G)
Drill, Portable, Electric (Item 7, Appendix C)
Tape, Adhesive, Rubber (Item 65.2, Appendix
Drill Set, Twist (Item 6, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Rivet, Blind (Item 254.1, Appendix G)
Tool Kit, Blind Rivet (Item 74, Appendix C)
Rivet, Blind (Item 254.2, Appendix G)
Socket Set, Socket Wrench (Item 34, Appendix C)
Wrench Set, Socket (Item 51, Appendix C)
Personnel Required
(3)
a. Removal.
(1) Remove 16 nuts (1), screws (2), and 32 washers (3)
from battery tray (4).
(2) Remove battery tray (4) from battery box (5).
(3) Deleted.
WARNING
Wear appropriate eye protection when
removing rivets. Failure to comply may
result in injury to personnel.
(3.1) Remove six rivets (6), washers (6.1), and two latches
(6.2) from battery box (5).
(3.2) Remove six band clamps (6.3) from battery box (5).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |