|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Cab raised (TM 9-2320-366-10-1).
Materials/Parts
Batteries disconnected (para 7-57).
Antiseize Compound (Item 13, Appendix D)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
WARNING
Coolant may be very hot and under pressure
from engine operation. Ensure engine is
cool before performing maintenance. Failure
to comply may result in injury to personnel.
Wear appropriate eye protection when
working under vehicle due to the possibility
of falling debris. Failure to comply may
result in injury to personnel.
a. Removal.
(1) Remove radiator cap (1) from radiator overflow tank (2).
(2) Position container under radiator draincock (3).
(3) Open radiator draincock (3) and drain approximately one
gallon (one L) of coolant.
(4) Close radiator draincock (3).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |