|
|
TM 9-2320-366-20-3
b. Controller Installation.
NOTE
All four controllers are installed the same
way. Boom Up/Down controller shown.
(1) Install jam nut (1) on boom up/down controller (2).
(2) Install knob (3) on boom up/down controller (2).
(3) Tighten jam nut (1) against knob (3).
WARNING
Adhesives, solvents, and sealing com-
pounds can burn easily, can give off
harmful vapors, and are harmful to skin
and clothing. Keep away from open fire
and use in a well-ventilated area. If
adhesive, solvent, or sealing compound
gets on skin or clothing, wash
immediately with soap and water. Failure
to comply may result in injury to
personnel.
(4) Apply adhesive to seating surface (4).
(5) Connect connector (5) to boom up/down controller (2).
(6) Position boom up/down controller (2) in REMOTE
CONTROL UNIT (6).
(7) Apply adhesive to the first 2 to 5 threads of mounting
studs (7).
(8) Position four self-locking nuts (8) on boom up/down
controller (2).
(9) Tighten four self-locking nuts (8) to 14 lb-in. (2 Nm).
NOTE
Adhesive requires 24 hours to cure.
(10) Spread excess adhesive over heads of four self-locking
nuts (8).
Change 1
7-191
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |