|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
d. Installation
b. Disassembly
e. Follow-On Maintenance
c. Assembly
INITIAL SETUP
Equipment Conditions
Materials/Parts
Crane erected (TM 9-2320-366-10-1).
Dispenser, Pressure Sensitive Adhesive Tape (Item 20,
Engine shut down (TM 9-2320-366-10-1).
Batteries disconnected (para 7-57).
Insulation Sleeving, Electrical (Item 29, Appendix D)
Varnish, Oil (Item 70, Appendix D)
Ties, Cable, Plastic (Item 69, Appendix D)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Nut, Conduit (3) (Item 124, Appendix G)
Goggles, Industrial (Item 15, Appendix C)
Nut, Conduit (3) (Item 125, Appendix G)
Drill, Portable, Electric (Item 7, Appendix C)
Lockwasher (4) (Item 94, Appendix G)
Drill Set, Twist (Item 6, Appendix C)
Lockwasher (10) (Item 91, Appendix G)
Tool Kit, Blind Rivet (Item 44, Appendix C)
Lockwasher (12) (Item 92, Appendix G)
Tool Kit, Electrical (Item 45, Appendix C)
Rivet, Blind (Item 255, Appendix G)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix
Lockwasher (Item 93, Appendix G)
Modification Kit, Junction Box (Item 31.1, Appendix D)
Rag, Wiping (Item 50, Appendix D)
a. Removal.
NOTE
Remove plastic cable ties as required.
(1) Loosen four screws (1) on junction box (2).
(2) Open cover (3) on junction box (2).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |