Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-5. 100 AMP VOLTAGE REGULATOR REPLACEMENT (CONT)
NOTE
Perform step (5) if replacing alternator
P/N N1506-1 (12420852) with alternator
P/N N1509-1 (12422863).
Install plastic cable ties to terminal lug
TL110 and tie wire away from alternator.
(5)
Apply electrical tape to terminal lug TL110 (6).
NOTE
Perform steps (5.1) through (7) on alternator
N1506-1 (12420852).
(5.1) Cut terminal lug TL110 (6) from engine control cable
assembly wire (6.1)
(6)
Remove dust boot (7) from engine control cable
assembly wire (6.1).
(7)
Apply electrical tape to engine control cable
assembly wire (6.1) so wire doesn't interfere with
engine or alternator operations.
(8)
Position terminal lug TL35 (10) on voltage regulator
(2) with washer (11), and self-locking nut (12).
Tighten self-locking nut (12) to 25 lb-in. (3 N m).
(9)
(10) Position dust boot (13) on terminal lug TL35 (10).
c. Follow-On Maintenance
(1)
Lower cab (TM 9-2320-366-10-1).
(2)
Connect batteries (para 7-57).
(3)
Start engine (TM 9-2320-366-10-1).
(4)
Check VOLTS gage for charge indication (TM 9-2320-
366-10-1).
(5)
Shut down engine (TM 9-2320-366-10-1).
End of Task.
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business