|
|
TM 9-2320-366-20-3
This task covers:
a. Top Radiator Fan Shroud Removal
d. Bottom Radiator Fan Shroud Installation
b. Top Radiator Fan Shroud Installation
e. Follow-On Maintenance
c. Bottom Radiator Fan Shroud Removal
INITIAL SETUP
Equipment Conditions
Tools and Special Tools (Cont)
Turbocharger to charge air cooler tube/hoses
Tool Kit, Genl Mech (Item 44, Appendix C)
removed (para 4-4).
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Charge air cooler to air inlet elbow tubes/
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
hoses removed (para 4-5).
Wrench, Torque, 0-75 lb-in. (Item 86, Appendix B)
Upper coolant tube and hoses removed (para
6-9).
Materials/Parts
Nut, Self-Locking (6) (Item 116, Appendix G)
Antifreeze, Ethylene Glycol, Permanent (Item 13,
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Container (52 qt (50 L) capacity)
Sealing Compound (Item 58, Appendix D)
Socket Set, Socket Wrench (Item 35, Appendix
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
a. Top Radiator Fan Shroud Removal.
(1) Loosen hose clamp (1) on radiator vent hose (2).
(2) Disconnect radiator vent hose (2) from radiator (3).
(3) Disconnect fan clutch hoses (4 and 5) from 90-degree
fitting (6).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |