|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Charge air cooler to air inlet elbow tubes/hoses
Rag, Wiping (Item 50, Appendix D)
removed (para 4-5).
Sealing Compound (Item 59, Appendix D)
Gasket (for valve cover 7W5627) (Item 42,
Tool and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Gasket (for valve cover 119-2960) (Item 28,
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 36, Appendix C)
Adhesive (Item 6, Appendix D)
Screw, Cap (14) (for replacement of valve cover
7W5627 with valve cover 119-2960) (Item 262,
a. Removal.
NOTE
Position hoses to allow access to valve
cover.
(1) Remove screw (1), washer (2), and clamp (3) from valve
cover (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |