|
|
TM
9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
(6) Install two battery cables (20 and 21) on NATO
connector (22) with two lockwashers (23) and
screws (24).
e. Follow-on Maintenance.
(1) Install No. 3 air reservoir (para 11-31).
(2) Install No. 1 air reservoir (para 11-29).
(4) Install fire extinguisher (M978 only)
(TM 9-2320-279-10).
END OF TASK
7-92.1. NATO SLAVE RECEPTACLE AND BOX REMOVAL/REPAIR/INSTALLATION.
This task covers:
d. Installation
a. Removal
e. Follow-on Maintenance
b. Disassembly
c. Assembly
INITIAL SETUP
References
Models
None
All
Equipment Condition
Test Equipment
None
TM or Para
Condition Description
TM 9-2320-279-10 Left side engine panel
Special Tools
removed.
None
Batteries disconnected.
Supplies
Special Environmental Conditions
Grease, automotive and artillery, Item 23,
None
Appendix C
Adhesive sealant, silicone, Item 4, Appendix C
General Safety Instructions
Tags, identification, Item 48, Appendix C
None
Ties, cable, plastic, Item 52, Appendix C
Personnel Required
MOS 63S, Heavy wheel vehicle mechanic
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |