Click here to make tpub.com your Home Page

Page Title: Removal.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-92.1. NATO SLAVE RECEPTACLE AND BOX REMOVAL/REPAIR/INSTALLATION (CONT).
a. Removal.
NOTE
Remove plastic cable ties as necessary.
q
Tag and mark all wires.
q
(1) Remove nut (1), lockwasher (2), and wire (3) from starter terminal (4).
(2) Remove nut (5) and wire (6) from solenoid terminal (7).
(3) Remove nut (8), lockwasher (9), washer (10), screw (11), and washer (10).
(4) Remove four screws (12), locknuts (13), and box (14) from fender (15) and clamp (16).
7-346

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business