Click here to make tpub.com your Home Page

Page Title: Assembly-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-92.
BATTERY BOX AND NATO CONNECTOR REMOVAL/REPAIR/INSTALLATION
(CONT).
NOTE
Do step (3) for Non-A2 and A2R1 model
vehicles.
(3)
Install NATO connector (10), top
plate (11), and connector cover
(12) on battery box (6) with four
screws (13) and locknuts (14).
NOTE
Do steps (3.1) and (3.2) for Non-A2
and A2R1 model vehicles only.
(3.1)
Install fitting (14.1) on battery
box (6).
(3.2)
Install hose (14.2) on fitting
(14.1) with hose clamp (14.3).
(4)
Install two quickedge moldings
(15).
(5)
Install four bolts (16) through
holes in flange (17).
(6)
Install two clips (18) over two
rear bolts (16).
(7)
Install two rubber hood hooks
(19) through hook brackets (1)
with two screws (20) and
locknuts (21).
(8)
Install two hood brackets (22) on
battery box cover (23) with four
screws (24) and locknuts (25).
Change 8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business