Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-73.1.1 BEACON LIGHT ASSEMBLY REMOVAL/REPAIR/INSTALLATION MODEL D
(M984E1) (CONT).
(5)
Install two grommets (17) on power supply (18).
(6)
Attach four connectors (19) to wires (20).
(7)
Install preformed packing (21) on power supply
(18), connect four connectors (19) and install
power supply to beacon light assembly (13) with
three screws (22).
(8)
Install flash tube assembly (23) on power
supply (18) using plug connection (24) and two
screws (25).
(9)
Install lens (26) on beacon light assembly (13)
with two screws (27), collar (28), and three
screws (29).
c.
Follow-on Maintenance..
(1)
Connect batteries (para 7-91).
(2)
Check M984E1 beacon light operation
(TM 9-2320-279-10).
END OF TASK
Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business