Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Engine Maintenance Instructions (Cont)
(6) Install gasket (14) on core (15). Install core in oil cooler housing (16).
(7) Install gasket (17).
(8) Install oil cooler housing (16), hose clamp (18), 12 screws (19), and lockwashers (20). Tighten
screws to 10 to 15 lb-ft (13 to 20 Nm).
c. Follow-on Maintenance.
(1) Install oil filter adapter (para 3-5).
(2) Install oil cooler inlet elbow and flange elbow (para 3-6).
(3) Fill cooling system with coolant (para 6-2).
(4) Start engine and check for leaks (TM 9-2320-279-10).
(5) Shut off engine (TM 9-2320-279-10).
(6) Install engine side panel (TM 9-2320-279-10).
(7) Close engine cover (TM 9-2320-279-10).
(8) Check engine oil (TM 9-2320-279-10).
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business