Click here to make tpub.com your Home Page

Page Title: Table 2-2. Unit Level Preventive Maintenance Checks And Services-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Table 2-2. Unit Level Preventive Maintenance Checks and Services
Interval
Item To Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
M978
Continued
NOTE
15.1
Biennial-
Tanker
ly
Filter
To complete this service, the tank must be
Separator
drained. After service is completed, prepare
tanker for operation and recirculate fuel (TM
9-2320-279-10).
NOTE
The filter separator must be drained (TM
9-2320-279-10) and the VT Venturi assembly
removed (paragraph 25-36) to perform the fol-
lowing service. After service is completed, re-
install VT Venturi assembly (paragraph
25-36)
and
recirculate
fuel
(TM
9-2320-279-10).
a. Change filter-separator elements.
a. Filter-separator ele-
ments have not been
changed in the past 24
months.
Change 8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business