|
|
TM 9-2320-211-34-2-3
FRAME 4
NOTE
Be sure nipples point in direction as shown. Hydraulic
lines will not be able to be put on if this is not done.
Screw in a n d tighten nipple (1) and pipe plug (2).
1.
Screw in a n d tighten two nipples (3) and nipple (4).
2.
Screw in a n d tighten two nipples (5).
3.
Screw in a n d tighten four nipples (6).
4.
NOTE
Follow-on Maintenance A c t i o n R e q u i r e d :
1. Replace control valve bank assembly. Refer to
T M 9-2320-211-20.
2 . Adjust valve bank relief valve. Refer to
T M 9-2320-211-20.
END OF TASK
17-648
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |