Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
FRAME 3
1.
P u t mounting angle (1) on control valve bank (2).
2.
Push three rods (3) through control valve bank (2).
3.
P u t on mounting angle (4).
4.
S c r e w on and hand tighten five nuts (5).
5.
T i g h t e n nuts (5) in order shown to 25 pound-feet.
D o step 5 again to 50 pound-feet.
6.
NOTE
Be sure holes in rods (3) line up with slots in nuts
( 5 ) when final tightness is reached.
7.
D o step 5 again to 75 pound-feet.
Put five spring pins (6) through nuts (5) and rods (3).
8.
GO TO FRAME 4
17-647

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business