|
|
TM 9-2320-211-34-2-3
17-52.
GONDOLA WRECKER ASSEMBLY REMOVAL, REPAIR, AND REPLACEMENT
(TRUCK M543A2).
N o special tools required
TOOLS:
Solvent, dry cleaning, type II (SD-2), Fed. Spec P-D-680
SUPPLIES:
PERSONNEL:
Two
Truck parked, engine off, handbrake set.
EQUIPMENT
CONDITION:
Preliminary
Procedures.
a.
(1) Drain hydraulic oil reservoir. Refer to LO 9-2320-211-12.
(2) Remove control valve bank cover. Refer to TM 9-2320-211-20.
(3) Remove gondola control valve assembly. Refer to TM 9-2320-211-20.
(4) Remove gondola floodlight assembly. Refer to TM 9-2320-211-20.
(5) Remove gondola guard. Refer to para 17-50.
(6) Remove oilcan bracket. Refer to TM 9-2320-211-20.
(7) Remove operator seat and backrest. Refer to TM 9-2320-211-20.
17-649
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |