Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
FRAME 3
1.
O n left side of truck, put cotter pin end of sheave pin (1) in sheave pin
h o l e ( 2 ) .  Push pin (1) half way to matching hole on other side of boom foot.
P u t sleeve bearing (3) on pin (1).
2.
P u t upper boom foot sheave (4) on pin (1). Put cable (5) in groove of
3.
sheave (4).
4.
A l i n e hole in sleeve bearing (6) with pin (1). Tap pin (1) through sleeve
bearing (6).
5.
Aline flat side of pin (1) with flat side of hole (7) on right side of boom foot.
T a p in pin (1).
P u t in cotter pin (8).
6.
7.
L u b r i c a t e upper boom foot sheave. Refer to LO 9-2320-211-12.
GO TO FRAME 4
17-338

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business