|
|
TM 9-2320-211-34-2-3
FRAME 2
1.
H o l d bend (1) of cable at top of boom head (2).
2.
H o l d sheave (3) in boom head (2) and put cable bend (1) in groove of
sheave (3).
3.
A l i n e hole of sheave (3) with pin (4) and tap pin (4) through sheave (3).
P u t thrust washer (5) on pin (4).
4.
5.
Aline flat side of pin (4) with flat side of hole (6) on left side of boom
h e a d . T a p in pin (4).
6.
P u t in cotter pin (7).
7.
P u t in lubrication fitting (8). Put in lubrication fitting (9).
GO TO FRAME 3
17-337
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |