TM 9-2320-211-34-2-3
FRAME 4
1.
H o l d cable guard (1) over cable at boom foot.
2.
P u t in two capscrews (2) with two washers (3).
3.
O n other side of cable guard, put in two capscrews (4) with two washers (5).
NOTE
Follow-on Maintenance Action Required:
1.
L u b r i c a t e head boom sheaves. Refer to
L O 9-2320-211-12.
2.
R a i s e and secure crane hook. Refer to
T M 9-2320-211-10.
END OF TASK