|
|
TM 9-2320-211-34-2-2
Replacement.
g.
FRAME 1
1.
P u t hoist and chain sling (1) on beam (2).
2.
L i f t beam (2) and place it near frame (3) as shown.
3.
P u t socket (4) into beam (2).
4.
S l i d e beam (2) into frame (3).
P u t o n s t o p ( 5 ) . P u t in two cap screws (6) with washers (7). Take off hoist
5.
a n d chain sling (1).
6.
P u t on jack (8). Drive in pin (9). Drive in Pin (10).
GO TO FRAME 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |