|
|
TM 9-2320-211-34-2-2
FRAME 8
P u t walking beam (1) in place on subbase (2) as shown.
1.
Soldiers
A and B
H o o k chain to subbase (2) as shown. Place wooden block and
2.
p r y b a r on walking beam (1) as shown.
P u s h down on prybar to aline hole in walking beam (1) with holes
Soldier A
3.
in subbase (2).
W h e n holes are alined, start subbase shaft (3) into subbase (2).
Soldier B
4.
B e sure that groove in shaft is at top.
D r i v e subbase shaft (3) to centered position in walking beam (1)
5.
and subbase (2). Check that groove in subbase shaft is alined
w i t h base shaft hole in walking beam.
U n h o o k chain from subbase (2) and set it aside.
Soldier A
6.
GO TO FRAME 9
14-79
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |