|
|
TM 9-2320-211-34-2-2
FRAME 9
U s i n g chain hoist, place base (1) in mounting position on
S o l d i e r A 1.
walking beam (2).
A l i n e holes in base (1) with holes in walking beam (2).Hold base
Soldier B 2.
i n position.
S t a r t base shaft (3) into holes of base (1). Make sure that screw
Soldier A 3.
hole in base shaft is lined up with hole in walking beam (2).
D r i v e base shaft (3) into centered position in base (1) and walking
4.
beam (2).
U n h o o k chain hoist from base (1).
Soldier B 5.
GO TO FRAME 10
14-80
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |