|
|
TM 9-2320-211-34-2-2
FRAME
7
If subbase bushings (1) were taken out, drive in two subbase bushings.
1.
Ream bushings to size as given in table 14-1. Refer to para 14-10d, frame 2.
P u t two springs (2) in holes in subbase (3).
2.
GO TO FRAME 8
14-78
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |