|
|
TM 9-2320-211-34-2-1
Replacement.
h.
FRAME 1
Put chain sling (1) around axle assembly (2).
1.
Hook chain sling (1) to hoist.
2.
Lift axle assembly (2) off axle stand (3) and onto hydraulic jack (4).
3.
Take off chain sling (1) and hoist.
4.
Put on two spring seats (5).
5.
Push hydraulic jack (4) with axle assembly (2) under truck. Put axle
Soldiers
6.
assembly under U-bolts (6 and 7).
A and B
GO TO FRAME 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |