Click here to make tpub.com your Home Page

Page Title: CRANE INNER BOOM ROLLER ASSEMBLY ADJUSTMENT (TRUCK M543A2).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-2
18-31. CRANE INNER BOOM ROLLER ASSEMBLY ADJUSTMENT (TRUCK M543A2).
TOOLS:  3/4-inch open end wrench
Spanner wrench
Hammer
Drift punch
Prybar
SUPPLIES:  Shims
PERSONNEL: One
EQUIPMENT CONDITION: Truck parked, engine off, handbrake set.
a.  Preliminary Procedures.
(1) Start engine. Refer to TM 9-2320-211-10.
(2) Operate boom to the 12 FOOT mark. Raise or lower boom, as needed,
until it is about level. Refer to TM 9-2320-211-10.
b.  Vertical Adjustment.
FRAME 1
1.
Using 3/4-inch wrench, unscrew and take out four screws with lockwashers
(1) from each roller assembly.
2.  Go to other side of boom (2) and do step 1 again for eight screws with lock-
washers on other side.
GO TO FRAME 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business