|
|
TM 9-2320-211-20-3-2
c.
Replacement.
FRAME 1
1.
Put lower boom roller (1) in place as shown and hold it in place.
Using 15/16-inch wrench, screw in and hand tighten three capscrews
2.
with lockwashers (2).
Do step 2 again on other side of boom and using 15/16-inch wrench, tighten
3.
three capscrews with lockwashers (2) on both sides of boom.
Put boom roller (3) in place on top of boom.
4.
Using 15/16-inch wrench, screw in and hand tighten three capscrews
5.
with lockwashers (4).
Do step 5 again on other side of boom and using 15/16-inch wrench,
6.
tighten three capscrews with lockwashers (4) on both sides of boom.
NOTE
Follow-on Maintenance Action Required:
Start engine. Refer to TM 9-2320-211-10.
1.
2.
Retract inner boom into outer boom assembly.
Refer to TM 9-2320-211-10.
Attach chain to hold crane block assembly in
3.
safe position on truck. Refer to TM 9-2320-211-10.
4.
Stop engine. Refer to TM 9-2320-211-10.
END OF TASK
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |