Click here to make tpub.com your Home Page

Page Title: Defuze Grenade, Hand
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1330-200-34/TM 1330-34/1
(5) Place fuze in packing support of shielded
(b) Solvent.
tray (fig. 5-7). Transfer to inspection operation or fuze
packing operation as required.
(c) Rags.
(6) Tools
and
equipment
include
the
(d) Rubber type, mounted (alt) stencil
following:
and stencil brush.
(a) Work table.
(e) Table, work.
(b) Vise, machinist 4 to 6 inches wide
(f) Can, safety, plunger-type.
jaw with wooden inserts.
(g) Gloves, disposable.
(c) Wrench, torque 3/8 male sq-drive,
150 in. lb capacity.
d. Defuze  Grenade,  Hand  (General  Support
(d) Adapter, fuze wrench.
Maintenance Only).
For defuzing operations, see
(e) Support, packing (fig. 5-7).
paragraph 105c(6), TM 9-1300-206.
(f) Pitch-in barricade (fig. 5-8).
NOTE
e. Inspect Fuze, Grenade, Hand.
When positioning torque wrench in
(1) Receive grenade fuzes from preceding
vise, care will be taken to insure that
operation or from supply operator. Check lot number
only the gripping portion of the
and nomenclature to assure fuzes are those for intended
wrench handle is clamped in vise.
work.
The vise should be equipped with
(2) Inspect each fuze for defects specified in
wooden inserts to prevent damaging
torque wrench.
(3) Place  acceptable  grenade  fuzes
in
sectionalized tray and transfer to next operation.
(1) Place torque wrench in vise.
(4) Place defective fuzes in sectionalized
(2) Receive
grenade
from
preceding
reject tray for transfer to destruction area.
operation. Engage fuze body in fuze wrench adapter.
(5) Tools
and
equipment
include
the
following:
WARNING
DO NOT USE IN EXCESS OF 100
(a) Work table.
INCH-POUNDS TO LOOSEN FUZE.
(b) Fuze tray, support packing (fig. 5-7).
GRENADES
WITH'
FUZES
REQUIRING  IN  EXCESS  OF  100
(c) Pitch-in, barricade (fig. 5-8).
INCH-POUNDS TO LOOSEN WILL BE
f. Assemble Fuze to Hand Grenade (General
REPACKED
FOR
SUBSEQUENT
Support Maintenance Only).
DISPOSAL OR REWORK BY DEPOT
OR LOADING PLANT PERSONNEL
(1) Receive grenade and fuze from preceding
AND FACILITIES.
operations.
(2) After assuring safe condition of safety pin,
remove from tray or packing support.
(3) Grasp grenade body, while observing
torque indicator, turn body in counterclockwise direction
(3) If  M204A1
or
M204A2
Fuze,
until completely unscrewed from grenade fuze.
assemble fiberglass sleeve over fuze delay column
housing. Sleeve should slide over fuze housing and butt
(4) Remove grenade body from fuze.
against shoulder under threads.  Adjust or replace if
necessary.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business