|
|
TM 9-1330-200-34/TM 1330-34/1
(2) While
holding
container
firmly
together, apply one and one-fourth wraps of pressure
(8) Transfer
closed
container
to
next
sensitive tape around joint formed by tip and bottom of
operation.
container, leaving a one and one-half inch pull tab.
When applying tape to container, use at least 10 pounds
(9) Material, tools and equipment include a
tension. Assure gap between container top and bottom
work table.
does not exceed 1/8 inch.
l. Tape Container
(3) Transfer
sealed
container
to
next
(1) Receive packed grenade in container
operation.
from preceding operation.
(2) Insert sealed container, tip end up, into
(4) Materials. Tools and equipment include
the following:
packing box to form complete rows lengthwise and
widthwise.
(a) Table, work.
(3) Place filler atop containers. Continue
(b) Tape, pressure sensitive.
packing containers if required, to complete second layer.
m. Pack Sealed Containers in Box.
(4) Add sufficient fillers to ends, side, and top
as required to assure a tight pack.
(1) Receive sealed container and packing
material from preceding operations.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |