|
|
TM 5-5420-279-23
(38)
Fold the A-Frame legs by pressing A-Frame fold park button on the interface panel until the
park light is on.
(39)
Insert the two A-Frame hinge locking pins and clips on each side.
(40)
Replace the two removable mudguards, and secure with R clips.
(41)
Fit transport strap to far bank support.
(42)
Close tail lift to transport position and fit transport straps.
(43)
Replace launcher chest pack and tail lift pendent in their storage box.
h.
Crane Removal And Replacement
For crane removal refer to direct support maintenance procedure 6-045.
5-486
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |