Click here to make tpub.com your Home Page

Page Title: GENERAL - SECTIONALIZATION OF THE LAUNCHER
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
5 - 159 GENERAL - SECTIONALIZATION OF THE LAUNCHER
This task covers:
a.
Introduction
b.
DSB far bank support removal
c.
DSB far bank support re-fitting
d.
Tail lift removal
e.
Tail lift re-fitting
f.
Launch equipment removal
g.
Launch equipment re-fitting
h.
Crane removal and replacement
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
None
Equipment Conditions
None
a.
Introduction
(1)
To reduce the overall weight and dimensional envelope of the launcher, it has been
designed for easy and rapid sectionalization. The crane, Tail lift and slide frame based
launcher and A-Frame stabilizer feet are all removable. This is achieved through the use
of quick disconnect hydraulic hoses, plug and socket electrical connections and wide use
of simple pinned mechanical attachments. Lifting and tie-down points are provided on the
crane and launcher to aid lifting.
(2)
Sectionalization of the launcher can be achieved within 1 hour and should be performed as
outlined in the section below.
b.
DSB Far Bank Support Removal
To remove the far bank support follow the procedure below:
NOTE
The Numbers on the diagrams refer to the Paragraph Numbers of the Text.
(1)
Release A-Frame shoot bolts and remove left and right hand mudguards

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business