Click here to make tpub.com your Home Page

Page Title: Assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
a.
Assembly
Heat the aluminum roller bodies in a hot water at 158oF (70oC) for approximately 30
(1)
minutes.
(2)
Assemble the roller in accordance with the relevant maintenance procedure.
NOTE
The roller must be assembled quickly, in approximately 60 seconds following the removal
of the roller body from the hot water.
(3)
Commence assembly from one end of the roller body, generally:
a. Fit retaining ring at one end of the roller body.
b. With the roller body in the vertical position, fit spacers and bearings as detailed in the
respective maintenance procedure.
NOTE
When fitting bearing seals, where applicable, ensure that the seal groove faces
outwards.
c.
Fit final retaining ring.
d. Lay roller body on its side and pull the bearings back up to the retaining rings at both
ends.
5-458

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business