|
|
TM 5-5420-279-23
This task covers:
a.
Remove sequence valve
b.
Install sequence valve
c.
Remove pressure reducing valve
d.
Install pressure reducing valve
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Allen Key Set
Materials Required
Thread locking compound, loctite 243
Seals (As required)
Equipment Conditions
A-Frame deployed and launch frame guards removed; see operator's manual
TM 5420-2789-10
WARNING
INJURY FROM EXTREME HYDRAULIC OIL PRESSURE. THE SYSTEM MUST BE
DE-PRESSURIZED BEFORE CARRYING OUT ANY WORK THE HYDRAULIC
SYSTEM.
SLIP AND FALL INJURY. PERSONNEL MAY SLIP ON SPILLED HYDRAULIC FLUID.
SUITABLE CONTAINERS AND FLUID ABSORBENT MATERIALS ARE TO BE USED
TO CONTAIN SPILLAGE.
NOTE
This procedure is applicable for removing and installing the 580 PSI (4000 kPa) pressure
reducing valve (2), 363 PSI (2500 kPa) pressure reducing valve (5), and sequencing valve
(6) fitted to the launch frame pilot manifold assembly (1).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |